VALENTINA CARRARA

Architects

VALENTINA CARRARA

Architects

Where old and new meet

Eddy – 1 level vertical extension – Brussels

Year:
2017

Building:
This is a typical three storey building from the 40’s

Scope:
The owner wants to investigate whether they can increase annual rental yield by adding a new apartment on the 3rd floor. This would lead to a better energy-performing building thanks to the new rooftop with reduced charges for the tenants and eventual increase of rental yield for the owner.

Project:
The new entity will be built in CLT and covered with a mix of Zinc and Trespa panels in rust tint giving it an eye-catching appearance.

Status of the project:
In study phase

Drawings and visualization © Valentina Carrara Architects

Share